Traction-Talk  

Go Back   Traction-Talk > Advertisements > Wanted Adverts
Register Donate Events Calendar Picture Albums

Wanted Adverts Steam items and equipment Wanted.

Reply
 
Thread Tools Display Modes
  #1  Post / In Thread 
Old 23rd December 2014, 05:08 PM
weidner weidner is offline
Engineer
 
Full Name: Bob Allison
Join Date: Nov 2007
Location: West Northamptonshire
Posts: 16,713
Default

Quote:
Originally Posted by the_asylum_wanderer View Post
I have been looking for pictures of Marshall water bowser , ( not even sure that they made them ) the type that has a spray bar at the back and would have been used by the road tarmac gangs ,
Can anyone help please or point me in the right direction
Not for TARmaccing tho' . Pre tar and bitumin days roads were made of waterbound roadstone . Suitable stone was supplied broken to size at the quarry , or was broken on site by a man with a hammer . The old surface was broken up by hand or with a scarifier , and the stone removed . The fresh stone was spread on the exposed foundations watered by the water cart , and rolled in by the roller . A competant roller driver could help form the camber of the road the way in which he worked over the job . Cambers were much more pronounced than we are used to , hence the conical rear wheel treads on some Burrell engines ( and others ?? )

This watering and rolling continued until the stone was levelled and firmly compacted in its own dust . The slurry formed by the rolling was swept back onto the road by the gang with brooms as the roller worked , and it was forced into the formation by the roller . Thus a good surface was obtained , but it was muddy in winter , and chokingly dusty in summer once pneumatic tyred motor vehicles appeared . The frost would freeze and heave the formation , causing it to break up in winter . So long as the traffic was iron tyred and horse drawn it was surprisingly durable . This was the system of roadmaking introduced by MacAdam .

Efforts were made later to solve the dust and frost problems by sealing the surface with gasworks tar .
Reply With Quote
  #2  Post / In Thread 
Old 23rd December 2014, 07:41 PM
marshall8hp's Avatar
marshall8hp marshall8hp is offline
Engineer
 
Full Name: David Toyne
Join Date: Nov 2007
Location: Sydney
Posts: 2,300
Default

Quote:
Originally Posted by weidner View Post
Not for TARmaccing tho' . Pre tar and bitumin days roads were made of waterbound roadstone .......... gasworks tar .
Clearly it is a little cold for working in the shed this evening!
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 05:34 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.