Traction-Talk  

Go Back   Traction-Talk > Steam Rallies > Steam Events
Register Donate Events Calendar Picture Albums

Steam Events Let others know about events in your area.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  Post / In Thread 
Old 28th January 2015, 12:36 AM
Bannaby Bannaby is offline
Apprentice
 
Full Name: Ken Ainsworth
Join Date: Oct 2010
Location: Australia
Posts: 47
Default

There were three of these Iroquois rollers imported from Barber Asphalt by Neuchâtel Asphalt the contractors who laid the paving across the Sydney Harbour Bridge during its construction. Two eight ton for the roadway and one five ton for the foot path along the side of the bridge. This is the five ton roller and one of the eight ton rollers is about to be dismantled for restoration very soon. The second eight ton roller has vanished completely. Only three of these rollers were imported into Australia.

The first photo is of one of the eight ton rollers working on the northern approaches to the bridge just below North Sydney Station. The second picture is one of the eight ton rollers at work in Sydney after the bridge was completed.
Attached Images
File Type: jpg Iroquois roller, Sydney Harbour Bridge, 2-9-1931. SRNSW.jpg (92.8 KB, 39 views)
File Type: jpg nla roller.jpg (74.3 KB, 41 views)
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 08:21 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.