View Single Post
  #5  Post / In Thread 
Old 9th September 2008, 04:13 PM
StephenH's Avatar
StephenH StephenH is offline
Engineer
 
Full Name: Stephen Hirst
Join Date: Nov 2007
Location: Salisbury
Posts: 330
Default

Just an update.
Tube plate OK. Just a little (2mm) building up desired around the bottom of the 'ash pan' (wet bottom) door on the outside and 2mm building up down just infront of the lap in the box. Lots of nice stays, email me for internal pictures as the boiler and box are so beautiful. Outside it would benefit from some paint.
Reply With Quote