View Single Post
  #8  Post / In Thread 
Old 31st October 2011, 05:53 PM
Puff's Avatar
Puff Puff is offline
Engineer
 
Full Name: Karen Smith
Join Date: May 2008
Location: Forfar
Posts: 150
Default

As far as I can tell both engines have been totally rebuilt, one boiler is complete the other requires tubes, the chassis are both pretty far advanced but the speed 12 is I think still short of the internals for the diffs. I was informed that they had diffs off of a diesel wagon BUT the engines turn different directions which would be a bit of a problem. There appear to be quite a lot of overhauled parts on the shelves ready to fit. In his defence Mike and his small team of helpers do have a lot to look after. At the event I was informed that mid week Goliaths crankshaft was out to look at a problem!
Puff's Fella (the Blackbunnet)

Last edited by Puff; 31st October 2011 at 06:00 PM..
Reply With Quote